Bronto Software Office Upfit - American Tobacco Building Durham, North Carolina
- This project design was for LEED Interior Completion for 11,600 square feet of space for Bronto Software in the American Tobacco complex in downtown Durham. The space was located on two floors. Engineering services provided were for plumbing, electrical and fire alarm in addition to USGGC LEED documentation.
Imperial Tower Office Building - Durham/Reseach Triangle Park, North Carolina
- This project consists of an 11 story, 267,000 square foot, high rise office building for commercial office tenants located in Research Triangle Park. Engineering services provided included HVAC, and plumbing including all USGBC documentation for LEED Silver rating for the project.
Mckim And Creed Engineering Office Upfit - Venture Iv Building Nc State University Centennial Campus Raleigh, North Carolina
- Located at NC State University, this space design for a consulting engineering firm was for LEED Interior Completion. The total space was 29, 540 square feet located on two floors in the Venture Complex on Centennial Campus. All USGBC LEED documentation was provided along with engineering services for HVAC, electrical, plumbing, fire sprinkler and fire alarm design.
North Carolina United Methodist Church Conference Center in Garner, NC
RDU Building #3 - Raleigh NC
- This project is a speculative office building constructed for LEED Shell and Core Certified rating. The building is located adjacent to the RDU International Airport near Research Triangle Park. Engineering services provided were for electrical and fire alarm along with USGC LEED documentation.